Regulators deny quick approval of new Great Lakes pipeline

FILE - In this June 8, 2017, file photo, fresh nuts, bolts and fittings are ready to be added to the east leg of the Enbridge Line 5 pipeline near St. Ignace, Mich., as Enbridge prepares to test the east and west sides of the Line 5 pipeline under the Straits of Mackinac in Mackinaw City, Mich. A Michigan regulatory panel refused Tuesday, June 30, 2020, to grant quick permission to run a new oil pipeline beneath a channel that connects two of the Great Lakes, deciding instead to conduct a full review.Enbridge filed an application in April with the Michigan Public Service Commission to relocate a segment of its Line 5 that extends beneath the Straits of Mackinac, which links Lakes Huron and Michigan.